Profile regions of your code and generate Gantt charts
active 2025-11-01 → 2026-08-12 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 285 days from 2025-11-01 to 2026-08-12. Pushes: 107 total, peak 28 in a day. Pull requests: 20 total, peak 10 in a day. Issues: 30 total, peak 8 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| max-models | 157 | 107 | 20 | 0 |
Recent activity
Latest issues, pull requests and releases
- Pull request#68max-models2026-03-22 12:47
- Pull request#66max-models2025-12-28 21:14
- Issue#59max-models2025-12-28 21:08Plot range/list of ranks
- Issue#65max-models2025-12-28 21:08Add Likwid plotter
- Issue#64max-models2025-12-28 21:06Plot compared barcharts between multiple files
- Issue#63max-models2025-12-28 21:05Generate speedup graph
- Issue#56max-models2025-12-28 20:28Sort the gantt chart
- Pull request#58max-models2025-12-28 20:28
- Issue#59max-models2025-12-28 20:13Plot range/list of ranks
- Issue#56max-models2025-12-16 16:38Sort the gantt chart
- Issue#55max-models2025-12-02 16:10Add profiling with `line_profiler`
- Issue#53max-models2025-11-29 14:02Add docstrings
- Issue#53max-models2025-11-29 13:03Add docstrings
- Pull request#51max-models2025-11-16 15:18
- Issue#8max-models2025-11-16 15:17Uh full rewrite in Rust?
- Issue#26max-models2025-11-16 13:15Use numpy arrays instead of list appends
- Pull request#47max-models2025-11-16 09:02
- Pull request#46max-models2025-11-15 23:38
- Pull request#44max-models2025-11-15 23:33
- Pull request#42max-models2025-11-15 23:12
- Pull request#40max-models2025-11-15 21:59
- Pull request#39max-models2025-11-15 19:44
- Pull request#36max-models2025-11-15 11:45
- Issue#22max-models2025-11-15 11:44Pre-bind LIKWID functions only once
- Pull request#35max-models2025-11-15 11:43
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.