Skip to content

长期健身计划助手。核心流程不是普通聊天,而是: 1. 配置长期计划与三分化模板 2. 每天主动生成“今天怎么练怎么吃” 3. 回填训练与饮食执行结果 4. 用短期记忆、知识库和调整提案支撑后续决策

active 2026-03-122026-05-14 (UTC)

Complete coverage27,239 / 27,241 hourly files (100%) · 2 absent upstream2023-08-152026-09-23 (UTC)
Events
21
Pushes
20
Pull requests
0
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 64 days from 2026-03-12 to 2026-05-14. Pushes: 20 total, peak 4 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
mianfeng202000

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.