Skip to content

JAX-Accelerated Mixed Model Association - Python reimplementation of GEMMA for GWAS

active 2026-02-012026-09-13 (UTC)

Complete coverage27,111 / 27,113 hourly files (100%) · 2 absent upstream2023-08-152026-09-17 (UTC)
Events
883
Pushes
609
Pull requests
64
Issues
4
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 225 days from 2026-02-01 to 2026-09-13. Pushes: 609 total, peak 28 in a day. Pull requests: 64 total, peak 6 in a day. Issues: 4 total, peak 3 in a day. Comments: 2 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
michael-denyer650608401
dependabot[bot]251240
github-actions[bot]4001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.