Skip to content

System Center Cross Platform Provider for Operations Manager

active 2023-10-19 → 2025-06-18 (UTC)

Complete coverage27,425 / 27,425 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-30 (UTC)
Events
78
Pushes
6
Pull requests
4
Issues
15
Stars
4
Forks
2

Activity over time

Daily event counts in the loaded window

Line chart, 609 days from 2023-10-19 to 2025-06-18. Pushes: 6 total, peak 2 in a day. Pull requests: 4 total, peak 1 in a day. Issues: 15 total, peak 5 in a day. Comments: 26 total, peak 7 in a day. Stars: 4 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
JumpingYang001210013
Yash-Khatri7221
ShirelyGu7015
Copilot4000
omkajale3210
simha50093000
MarcPosch3001
Jodie1112200
NikPerne2002
edwio2000
mswilson1001
mohag1001
gdarwish91000
narendrasree1000
blakedrumm1001
gregaperko1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.