Skip to content

active 2025-04-132025-07-28 (UTC)

Complete coverage26,656 / 26,656 hourly files (100%) · 2 absent upstream2023-08-152026-08-29 (UTC)
Events
57
Pushes
10
Pull requests
6
Issues
33
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 107 days from 2025-04-13 to 2025-07-28. Pushes: 10 total, peak 4 in a day. Pull requests: 6 total, peak 2 in a day. Issues: 33 total, peak 24 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
moibra05491060

Recent activity

Latest issues, pull requests and releases

  • Issue#30moibra052025-07-28 21:41
    create navbar
  • Pull request#31moibra052025-07-28 21:41
  • Issue#30moibra052025-07-28 21:40
    create navbar
  • Pull request#29moibra052025-06-17 05:02
  • Issue#28moibra052025-06-15 16:05
    transition project to supabase backend
  • Issue#7moibra052025-05-16 14:38
    create user signup/login ui
  • Pull request#27moibra052025-05-16 01:05
  • Pull request#27moibra052025-05-16 01:04
  • Issue#25moibra052025-05-15 17:01
    create landing page
  • Pull request#26moibra052025-05-15 16:59
  • Pull request#26moibra052025-05-15 16:58
  • Issue#25moibra052025-04-16 18:16
    create landing page
  • Issue#5moibra052025-04-16 18:16
    setup backend
  • Issue#4moibra052025-04-16 18:16
    setup frontend
  • Issue#1moibra052025-04-15 22:35
    wireframe for core pages
  • Issue#24moibra052025-04-13 20:28
    export wishlist as pdf
  • Issue#23moibra052025-04-13 20:27
    deploy backend to aws lambda
  • Issue#22moibra052025-04-13 20:27
    deploy frontend to vercel
  • Issue#21moibra052025-04-13 20:26
    deploy
  • Issue#20moibra052025-04-13 20:25
    setup aws ses
  • Issue#19moibra052025-04-13 20:24
    connect lambda to db
  • Issue#18moibra052025-04-13 20:23
    setup eventbridge schedule
  • Issue#17moibra052025-04-13 20:23
    setup aws lambda function
  • Issue#16moibra052025-04-13 20:23
    build line chart for price history
  • Issue#15moibra052025-04-13 20:22
    save price history to db

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.