Skip to content

Droar is a modular, single-line installation debugging window

active 2023-12-03 → 2026-03-23 (UTC)

Complete coverage28,103 / 28,103 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-28 (UTC)
Events
39
Pushes
0
Pull requests
0
Issues
7
Stars
24
Forks
5

Activity over time

Daily event counts in the loaded window

Line chart, 842 days from 2023-12-03 to 2026-03-23. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 7 total, peak 2 in a day. Comments: 3 total, peak 1 in a day. Stars: 24 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
zakora313001
TheIronMarx2000
prufrock1001
fiskjohn000-dev1000
larsd77771000
revanw907-cmyk1001
kdkjfbbjfi134-pixel1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 24 stars here means stars gained during the window, not the repo's star count.