Skip to content

一个受taskflow-cpp启发的Go任务流框架,通过原生goroutine实现高性能并发执行,支持静态任务编排、动态子流程嵌套、条件分支与循环逻辑,内置任务优先级调度、可视化调试(DOT图/火焰图)及错误传播控制,适用于构建可扩展的数据管道、AI自动化流程和复杂任务依赖系统

active 2024-03-09 → 2026-06-27 (UTC)

Complete coverage27,296 / 27,299 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-25 (UTC)
Events
1.3K
Pushes
220
Pull requests
133
Issues
58
Stars
549
Forks
23

Activity over time

Daily event counts in the loaded window

Line chart, 841 days from 2024-03-09 to 2026-06-27. Pushes: 220 total, peak 34 in a day. Pull requests: 133 total, peak 14 in a day. Issues: 58 total, peak 5 in a day. Comments: 135 total, peak 13 in a day. Stars: 549 total, peak 90 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 549 stars here means stars gained during the window, not the repo's star count.