Skip to content

E2 AP Termination module for ONOS SD-RAN (µONOS Architecture)

active 2023-09-29 → 2026-02-16 (UTC)

Complete coverage28,425 / 28,425 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-11 (UTC)
Events
305
Pushes
18
Pull requests
98
Issues
0
Stars
1
Forks
9

Activity over time

Daily event counts in the loaded window

Line chart, 872 days from 2023-09-29 to 2026-02-16. Pushes: 18 total, peak 5 in a day. Pull requests: 98 total, peak 14 in a day. Issues: 0 total, peak 0 in a day. Comments: 73 total, peak 14 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
dependabot[bot]11687533
gab-arrobo314616
onf-bot250322
woojoong8817681
yhm16203030
jmajnert1010
eb-oss1010
Agarwal-Shivansh1010
adibrastegarnia1001
SeanCondon1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.