A cross-grid-level electricity grid and storage optimization tool
active 2024-04-05 → 2026-07-17 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 834 days from 2024-04-05 to 2026-07-17. Pushes: 34 total, peak 4 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 14 total, peak 7 in a day. Comments: 2 total, peak 1 in a day. Stars: 3 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| ClaraBuettner | 19 | 9 | 0 | 2 |
| birgits | 16 | 16 | 0 | 0 |
| KathiEsterl | 10 | 3 | 0 | 0 |
| joda9 | 5 | 5 | 0 | 0 |
| MoritzSchloesser | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#180KathiEsterl2026-06-29 14:34Restructure eGo class design
- Issue comment#166ClaraBuettner2026-02-26 08:40Change execution order of MV grid clustering
- Issue#168ClaraBuettner2026-02-26 08:30Update integration of eTraGo
- Issue#166ClaraBuettner2026-02-26 08:21Change execution order of MV grid clustering
- Issue#166ClaraBuettner2026-02-26 08:21Change execution order of MV grid clustering
- Issue#166ClaraBuettner2026-02-26 08:21Change execution order of MV grid clustering
- Issue#166ClaraBuettner2026-02-26 08:21Change execution order of MV grid clustering
- Issue#166ClaraBuettner2026-02-26 08:21Change execution order of MV grid clustering
- Issue comment#162ClaraBuettner2026-01-29 10:06Fix and update installation
- Issue#83KathiEsterl2026-01-29 09:19How to deal with faulty MV grids in eGo
- Issue#124KathiEsterl2026-01-29 09:19eGo Performance
- Issue#124KathiEsterl2026-01-29 09:19eGo Performance
- Issue#11KathiEsterl2026-01-29 09:17ETraGoSpecs (eTraGo-eDisGo-Interface)
- Issue#11KathiEsterl2026-01-29 09:17ETraGoSpecs (eTraGo-eDisGo-Interface)
- Issue#163ClaraBuettner2026-01-29 09:15Update documentation
- Issue#156ClaraBuettner2026-01-29 09:07Setup database connection problem
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 3 stars here means stars gained during the window, not the repo's star count.