Skip to content

The primary goal of the Everest tool is to find optimal well planning and production strategies by utilising an ensemble of reservoir models (e.g., an ensemble of geologically-consistent models). This will enable robust decisions about drilling schedule and well placement, in order to achieve results of significant practical value.

active 2024-09-10 → 2024-09-16 (UTC)

Complete coverage28,430 / 28,430 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-11 (UTC)
Events
16
Pushes
7
Pull requests
0
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 7 days from 2024-09-10 to 2024-09-16. Pushes: 7 total, peak 3 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
oyvindeide7700

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.