Skip to content

Administracion de un Club deportivo Patagónico

active 2025-08-19 → 2026-06-21 (UTC)

Complete coverage27,475 / 27,475 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-02 (UTC)
Events
980
Pushes
434
Pull requests
200
Issues
2
Stars
0
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 307 days from 2025-08-19 to 2026-06-21. Pushes: 434 total, peak 51 in a day. Pull requests: 200 total, peak 50 in a day. Issues: 2 total, peak 1 in a day. Comments: 105 total, peak 36 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
p2pdevmedia4523071430
ramosjuanfr-art182125570
vercel[bot]970097
chatgpt-codex-connector[bot]18008
aninomariano2200

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.