Rust data engineering
active 2024-10-26 → 2025-01-27 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 94 days from 2024-10-26 to 2025-01-27. Pushes: 88 total, peak 18 in a day. Pull requests: 81 total, peak 16 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Recorded stars: 4 total, peak 2 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Recorded stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| papadritta | 169 | 88 | 81 | 0 |
Recent activity
Latest issues, pull requests and releases
PR door speed
Human PRs opened in 2024 (41), closes followed to the end of June 2025. Closed means merged or rejected; bots and Copilot excluded.
Half of the human pull requests opened here in 2024 were closed within 1 minute; 10% were still open at the end of June 2025.
Of 41 human pull requests opened in 2024: 90% closed within a day, 0% closed in 1 to 7 days, 0% closed in 7 to 30 days, 0% closed after 30 days, 10% still open.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.