Skip to content

prgrms-fe-devcourse/NFE1-2-LocalStage

View on GitHub ↗Related repositories →

프로그래머스 데브코스 2차 LocalStage 팀 프로젝트

active 2024-09-13 → 2025-04-28 (UTC)

Complete coverage28,435 / 28,435 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-11 (UTC)
Events
1.5K
Pushes
424
Pull requests
192
Issues
166
Stars
4
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 228 days from 2024-09-13 to 2025-04-28. Pushes: 424 total, peak 63 in a day. Pull requests: 192 total, peak 29 in a day. Issues: 166 total, peak 28 in a day. Comments: 162 total, peak 41 in a day. Stars: 4 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
shlee999947911191100
thsk32281012911
jymaeng1234214702528
se0kcess182862914
bluedog12914956189

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.