Skip to content

🎨 A succinct matplotlib wrapper for making beautiful, publication-quality graphics

active 2023-08-18 → 2026-02-15 (UTC)

Complete coverage28,420 / 28,420 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-11 (UTC)
Events
445
Pushes
1
Pull requests
13
Issues
35
Stars
199
Forks
20

Activity over time

Daily event counts in the loaded window

Line chart, 913 days from 2023-08-18 to 2026-02-15. Pushes: 1 total, peak 1 in a day. Pull requests: 13 total, peak 4 in a day. Issues: 35 total, peak 3 in a day. Comments: 177 total, peak 8 in a day. Stars: 199 total, peak 9 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
cvanelteren710563
riley-brady390235
austin-hoover100010
kinyatoride6002
longtsing6060
Migelo5005
huddao5005
Mickychen005005
gepcel5005
reemagit5004
rvalenzuelar5003
ybmy0014001
KingRyu19984003
syrte3003
chudlerk3003
Eisbrenner3000
Koni20203002
AWSisco2002
singledoggy2000
beckermr2002

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 199 stars here means stars gained during the window, not the repo's star count.