Skip to content

Specialized construction management platform designed for small to medium-sized enterprises (SMEs) operating in the EU construction sector. It bridges the communication gap between subcontractors and project managers while ensuring strict compliance with EU funding requirements.

active 2026-02-15 → 2026-04-26 (UTC)

Archive files: complete28,666 / 28,666 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-21 (UTC)Some event types are under-captured. Data limits →
Events
107
Pushes
11
Pull requests
1
Issues
87
Recorded stars
0
Recorded forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 71 days from 2026-02-15 to 2026-04-26. Pushes: 11 total, peak 5 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 87 total, peak 45 in a day. Comments: 7 total, peak 4 in a day. Recorded stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
gita-agents[bot]89006
r-log171111

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.