Skip to content

resilient-tech/payment_integration_utils

View on GitHub ↗Related repositories →

Payment Integration Utils for ERPNext

active 2025-03-01 → 2026-07-05 (UTC)

Complete coverage27,725 / 27,725 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-13 (UTC)
Events
228
Pushes
41
Pull requests
49
Issues
15
Stars
14
Forks
6

Activity over time

Daily event counts in the loaded window

Line chart, 492 days from 2025-03-01 to 2026-07-05. Pushes: 41 total, peak 6 in a day. Pull requests: 49 total, peak 15 in a day. Issues: 15 total, peak 2 in a day. Comments: 49 total, peak 32 in a day. Stars: 14 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Abdeali0998030325
resilient-tech-bot333525
mergify[bot]3041115
vorasmit8410
coderabbitai[bot]4003
nikkothari221000
github-advanced-security[bot]1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 14 stars here means stars gained during the window, not the repo's star count.