Skip to content

CLI for Gihtub Project

active 2025-08-242026-01-10 (UTC)

Complete coverage26,353 / 26,353 hourly files (100%) · 2 absent upstream2023-08-152026-08-17 (UTC)
Events
51
Pushes
10
Pull requests
1
Issues
27
Stars
3
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 140 days from 2025-08-24 to 2026-01-10. Pushes: 10 total, peak 5 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 27 total, peak 11 in a day. Comments: 8 total, peak 8 in a day. Stars: 3 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
serithemage461018

Recent activity

Latest issues, pull requests and releases

  • Issue#26serithemage2026-01-10 04:16
    Bug: discussion create fails with GraphQL type mismatch error
  • Issue#25serithemage2026-01-10 04:15
    Rename project from ghp-cli to ghx-cli (GitHub eXtensions)
  • Issue#22serithemage2026-01-10 04:06
    Bug: GraphQL variable type definition error in project, field, and view operations
  • Issue comment#16serithemage2026-01-10 03:40
    [Testing] Comprehensive E2E Test Suite
  • Issue#14serithemage2026-01-10 03:40
    [Infrastructure] CI/CD Pipeline Setup
  • Issue comment#14serithemage2026-01-10 03:40
    [Infrastructure] CI/CD Pipeline Setup
  • Issue comment#12serithemage2026-01-10 03:40
    [Phase 4] Migration Tools from Jira/Trello/Asana
  • Issue comment#11serithemage2026-01-10 03:40
    [Phase 4] Backup and Restore Functionality
  • Issue#10serithemage2026-01-10 03:40
    [Phase 4] Enterprise Scale Support (50,000+ items)
  • Issue comment#10serithemage2026-01-10 03:40
    [Phase 4] Enterprise Scale Support (50,000+ items)
  • Issue#9serithemage2026-01-10 03:40
    [Phase 4] Cross-Repository Project Support
  • Issue comment#8serithemage2026-01-10 03:40
    [Phase 3] Progress Visualization
  • Issue#7serithemage2026-01-10 03:40
    [Phase 3] Time Tracking and Reporting
  • Issue comment#6serithemage2026-01-10 03:40
    [Phase 3] Custom Report Templates
  • Issue#4serithemage2026-01-10 03:40
    [Phase 2] Iteration Management and Sprint Planning
  • Issue#3serithemage2026-01-10 03:40
    [Phase 2] Advanced Filtering and Search Operators
  • Issue comment#1serithemage2026-01-10 03:40
    [Phase 2] Interactive TUI Mode with Bubble Tea
  • Issue#21serithemage2026-01-10 02:41
    feat: Add GitHub Discussions support (ghp discussion)
  • Issue#21serithemage2026-01-10 02:09
    feat: Add GitHub Discussions support (ghp discussion)
  • Issue#20serithemage2025-11-20 22:40
    Feature Request: Add 'project create' command for GitHub Projects V2
  • Pull request#19serithemage2025-08-27 03:26
  • Issue#18serithemage2025-08-27 03:08
    Feature Request: Enhanced Project Management Capabilities
  • Issue#17serithemage2025-08-26 00:03
    [Enhancement] Plugin System Architecture
  • Issue#16serithemage2025-08-26 00:03
    [Testing] Comprehensive E2E Test Suite
  • Issue#14serithemage2025-08-26 00:02
    [Infrastructure] CI/CD Pipeline Setup

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 3 stars here means stars gained during the window, not the repo's star count.