A pipeline to preprocess H&E slides in input. The slides will go through a thresholding and edge detection to isolate the tissue before being tessellated into small patches for downstream analysis.
active 2023-11-20 → 2024-04-22 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 155 days from 2023-11-20 to 2024-04-22. Pushes: 23 total, peak 3 in a day. Pull requests: 18 total, peak 3 in a day. Issues: 0 total, peak 0 in a day. Comments: 13 total, peak 5 in a day. Stars: 1 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| sandrocarollo | 54 | 17 | 10 | 13 |
| MattGiro | 12 | 6 | 6 | 0 |
| abyssum | 2 | 0 | 2 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.