Coordination repo for The Development System: an ECC-style multi-agent dev pipeline built on CADS-Tunnel's crew-auction primitives (#382)
active 2026-08-03 → 2026-08-24 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 22 days from 2026-08-03 to 2026-08-24. Pushes: 53 total, peak 11 in a day. Pull requests: 3 total, peak 1 in a day. Issues: 1 total, peak 1 in a day. Comments: 6 total, peak 6 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| scimbe | 58 | 51 | 0 | 6 |
| dependabot[bot] | 5 | 2 | 3 | 0 |
Recent activity
Latest issues, pull requests and releases
- Pull request#73dependabot[bot]2026-08-18 23:08
- Pull request#62dependabot[bot]2026-08-11 23:06
- Issue comment#54scimbe2026-08-07 17:37devsystem-demo: the "succeeded iteration admits a known defect" risk is a bare substring match with no stage awareness -- it fires on an honest devsystem.review reporting a defect it found, and is silently evaded by rewording "not fixed" to "still awaits repair"
- Issue comment#52scimbe2026-08-07 17:20devsystem-demo: #38's iteration `id`/`submitted_at` landed create-time only -- 114 of 133 records platform-wide (18 of webconference-android's 21) carry `id: ""` and `submitted_at: 0`, so `id` is not a key and #42's id-keyed cross-references cannot be built on it
- Issue comment#47scimbe2026-08-07 17:19devsystem-demo: max_consecutive_failures is not a bound either -- Resume steps past it exactly like #46 (health panel renders "consecutive failures: 3 / 2"), and the one control that clears the budget is the New Iteration form's default-checked "succeeded" box
- Issue comment#53scimbe2026-08-07 17:04devsystem-demo: "stalled stage" is cleared by any iteration record, not by successful work -- one succeeded:false iteration permanently silences it, and it already has for 3 of webconference-android's 5 added stages (#12/#13/#14, the infra-blocked ones)
- Issue comment#51scimbe2026-08-07 16:54devsystem-demo: "+ New Project" promises "the generic 7-stage pipeline template" but creates a run with exactly one role (devsystem.plan) -- so the New Iteration stage dropdown offers nothing but plan, and every other stage must be hand-typed into the unvalidated free-text box (#49 becomes the default path, not an edge case)
- Issue#53scimbe2026-08-07 16:53devsystem-demo: "stalled stage" is cleared by any iteration record, not by successful work -- one succeeded:false iteration permanently silences it, and it already has for 3 of webconference-android's 5 added stages (#12/#13/#14, the infra-blocked ones)
- Issue comment#40scimbe2026-08-07 16:40devsystem-demo: an iteration record has no actor -- the crew auction's winner is never written into the work record, and the only `who` in the API expires after 300s, so "who submitted iteration N" is permanently unanswerable
- Pull request#1dependabot[bot]2026-08-04 00:15
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.