Skip to content

ToonDo는 귀여운 슬라임 캐릭터와 함께 목표를 설정하고 작업을 관리하는 생산성 앱입니다. 투두를 완료하고 젤리를 모아 슬라임을 꾸미면서 동기부여를 받을 수 있습니다. Flutter와 Spring Boot로 개발되었으며, 아이젠하워 매트릭스에 기반하여 체계적인 일정 관리가 가능합니다.

active 2024-12-26 → 2026-06-10 (UTC)

Complete coverage28,046 / 28,046 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-26 (UTC)
Events
262
Pushes
109
Pull requests
55
Issues
15
Stars
6
Forks
2

Activity over time

Daily event counts in the loaded window

Line chart, 532 days from 2024-12-26 to 2026-06-10. Pushes: 109 total, peak 7 in a day. Pull requests: 55 total, peak 5 in a day. Issues: 15 total, peak 5 in a day. Comments: 30 total, peak 5 in a day. Stars: 6 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
sjin4861163106366
aengzu313197
Copilot270017

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 6 stars here means stars gained during the window, not the repo's star count.