Skip to content

这是一个嵌入式裸机框架,提供一套API,方便管理多种任务,比如超时任务/周期任务/并行任务/互斥任务等。 有 sys_wait 和 sys_wait_bare 这两个非阻塞等待 API ,支持挂起当前互斥任务,但不阻塞并行任务。

active 2025-03-15 → 2026-04-08 (UTC)

Complete coverage27,661 / 27,661 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-10 (UTC)
Events
61
Pushes
4
Pull requests
0
Issues
4
Stars
40
Forks
8

Activity over time

Daily event counts in the loaded window

Line chart, 390 days from 2025-03-15 to 2026-04-08. Pushes: 4 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 4 total, peak 2 in a day. Comments: 2 total, peak 1 in a day. Stars: 40 total, peak 16 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 40 stars here means stars gained during the window, not the repo's star count.