Skip to content

Home building project management application with Gantt charts, budgeting, and document management

active 2026-02-05 → 2026-09-10 (UTC)

Complete coverage27,329 / 27,329 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-26 (UTC)
Events
4.6K
Pushes
1.4K
Pull requests
651
Issues
564
Stars
0
Forks
2

Activity over time

Daily event counts in the loaded window

Line chart, 218 days from 2026-02-05 to 2026-09-10. Pushes: 1,350 total, peak 70 in a day. Pull requests: 651 total, peak 51 in a day. Issues: 564 total, peak 46 in a day. Comments: 622 total, peak 58 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
steilerDev2.2K1.2K325135
github-actions[bot]8429211481
steilerdev-cornerstone-bot[bot]15315300
dependabot[bot]12491132
macan882011
CLAassistant2002
Asobu011001
jszzr1010

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.