Skip to content

swcarpentry/python-novice-gapminder

View on GitHub ↗Related repositories →

Plotting and Programming in Python

active 2023-08-15 → 2026-07-07 (UTC)

Complete coverage27,286 / 27,289 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-25 (UTC)
Events
608
Pushes
212
Pull requests
74
Issues
10
Stars
24
Forks
53

Activity over time

Daily event counts in the loaded window

Line chart, 1058 days from 2023-08-15 to 2026-07-07. Pushes: 212 total, peak 8 in a day. Pull requests: 74 total, peak 6 in a day. Issues: 10 total, peak 2 in a day. Comments: 133 total, peak 13 in a day. Stars: 24 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
github-actions[bot]219180039
alee76152322
vahtras36111014
tobyhodges230215
carpentries-bot162140
drammock13009
martinosorb6132
dpshelio5003
brownsarahm5002
maneesha4120
mhagdorn3002
zkamvar3003
jansim3012
gabrielesh3003
katrinabrock3001
catgonzftw12001
steltenpower2020
Fgazzelloni2001
Shivay-Shakti2011
rachelicr2011

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 24 stars here means stars gained during the window, not the repo's star count.