Skip to content

sync7319/Senior-Design-Project-2024

View on GitHub ↗Related repositories →

Faults in power delivery equipment can cause widespread outages. However, isolating the fault location can significantly reduce the number of affected customers. This project aims to decrease power outages by 67% by dividing the delivery network into three segments, improving reliability and minimizing the impact of equipment faults.

active 2024-10-12 → 2025-01-14 (UTC)

Complete coverage28,444 / 28,444 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-12 (UTC)
Events
101
Pushes
41
Pull requests
0
Issues
55
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 95 days from 2024-10-12 to 2025-01-14. Pushes: 41 total, peak 15 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 55 total, peak 55 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
ryescholin56001
sync7319414100

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.