Skip to content

team-O-Lim/mini-project-task-manager

View on GitHub ↗Related repositories →

신대사 사물인터넷

active 2025-09-04 → 2026-04-10 (UTC)

Complete coverage28,041 / 28,041 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-26 (UTC)
Events
521
Pushes
151
Pull requests
129
Issues
103
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 219 days from 2025-09-04 to 2026-04-10. Pushes: 151 total, peak 17 in a day. Pull requests: 129 total, peak 17 in a day. Issues: 103 total, peak 13 in a day. Comments: 2 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
minion-K12851560
nolang227327212
cgung77233240
rpsnrpsn6221160
Hong-ki-su5019120

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.