active 2024-07-31 → 2024-08-14 (UTC)
Complete coverage26,756 / 26,756 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-02 (UTC)
Events
18
Pushes
0
Pull requests
0
Issues
17
Stars
0
Forks
0
Activity over time
Daily event counts in the loaded window
Line chart, 15 days from 2024-07-31 to 2024-08-14. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 17 total, peak 11 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| clover-clever | 12 | 0 | 0 | 0 |
| tkdgusqkr | 5 | 0 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#18clover-clever2024-08-14 14:0924 (Accumulator) Move Connection Board to Outer layer of Accumulator Box
- Issue#17clover-clever2024-08-14 12:5524 (Bolt) List up Needed Fasteners
- Issue#15clover-clever2024-08-14 11:5324 (GLVS) Brake Light Maintenance
- Issue#9tkdgusqkr2024-08-11 03:5725 Sensor hub 기판 점검
- Issue#9tkdgusqkr2024-08-11 03:5525 Sensor hub 기판 점검
- Issue#16tkdgusqkr2024-08-10 10:2824 (Accumulator) Connection PCB Wall Mounting change to Outer Wall
- Issue#16tkdgusqkr2024-08-10 10:2724 (Accumulator) Connection PCB Wall Mounting change to Outer Wall
- Issue#16clover-clever2024-08-10 10:2724 (Accumulator) Connection PCB Wall Mounting change to Outer Wall
- Issue#15clover-clever2024-08-10 10:1024 (GLVS) Brake Light Maintenance
- Issue#14clover-clever2024-08-10 09:4624 (Accumulator) BMS Profile Setting
- Issue#13clover-clever2024-08-10 09:3924 (Accumulator) PCB Conformal Coating
- Issue#12clover-clever2024-08-10 07:3124 (Accumulator) Purchase Precharge Relay with Auxiliary Contact - LEV100H5CNG
- Issue#11clover-clever2024-08-10 03:2724 (E-Powertrain) TSMP Connector add Interlock
- Issue#10clover-clever2024-08-10 03:2624 (Accumulator) Change Precharge Relay to LEV100H5CNG
- Issue#10clover-clever2024-08-10 03:2424 (Accumulator) Change Precharge Relay to LEV100H5CNG
- Issue#10clover-clever2024-08-10 03:2424 (Accumulator) Change Precharge Relay to LEV100H5CNG
- Issue#9tkdgusqkr2024-08-09 15:1725 Sensor hub 기판 점검
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.