Skip to content

Framing Earth System Data for Insight and Reproducibility.

active 2025-06-122025-11-11 (UTC)

Complete coverage26,443 / 26,443 hourly files (100%) · 2 absent upstream2023-08-152026-08-20 (UTC)
Events
112
Pushes
80
Pull requests
2
Issues
11
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 153 days from 2025-06-12 to 2025-11-11. Pushes: 80 total, peak 13 in a day. Pull requests: 2 total, peak 1 in a day. Issues: 11 total, peak 7 in a day. Comments: 4 total, peak 3 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
tomvothecoder837821
Copilot2000

Recent activity

Latest issues, pull requests and releases

  • Issue comment#7tomvothecoder2025-08-26 18:32
    [DevOps] Scope out initial hosting and cybersecurity requirements
  • Issue#7tomvothecoder2025-08-26 18:32
    [DevOps] Scope out initial hosting and cybersecurity requirements
  • Issue#15tomvothecoder2025-08-26 18:21
    [Planning] Establish project kick off meeting and bi-weekly sprints
  • Issue comment#11tomvothecoder2025-07-24 17:33
    [DevOps] Establish frontend architecture and styling conventions
  • Issue#21tomvothecoder2025-07-24 17:31
    [Enhancement] Ingest and expose provenance data from diagnostics
  • Issue comment#14tomvothecoder2025-07-24 17:30
    [Planning] Gather technical requirements based on design prototypes
  • Issue#14tomvothecoder2025-07-24 17:30
    [Planning] Gather technical requirements based on design prototypes
  • Issue comment#12tomvothecoder2025-07-24 17:28
    [Enhancement]: Start converting design prototype to working prototype
  • Issue#12tomvothecoder2025-07-24 17:28
    [Enhancement]: Start converting design prototype to working prototype
  • Issue#18tomvothecoder2025-07-24 17:22
    [Enhancement] Create a database of existing simulations by extracting information from Confluence
  • Issue#17tomvothecoder2025-07-24 17:22
    [Enhancement] Replace mock API calls in frontend with real endpoints
  • Issue#13tomvothecoder2025-07-24 17:20
    [Planning] Develop design prototypes
  • Issue#11tomvothecoder2025-07-24 17:17
    [DevOps] Establish frontend architecture and styling conventions
  • Issue#8tomvothecoder2025-07-22 21:43
    [Planning] Define and document data contract for backend planning
  • Issue#5tomvothecoder2025-07-22 21:39
    [Planning] Convert design prototype and stakeholder feedback to technical requirements
  • Pull request#3tomvothecoder2025-07-01 23:12
  • Pull request#2tomvothecoder2025-06-12 23:26

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.