Permanent PiCam (SO2) installation project software
active 2023-08-15 → 2024-12-14 (UTC)
Complete coverage27,399 / 27,399 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-29 (UTC)
Events
1.2K
Pushes
157
Pull requests
156
Issues
149
Stars
2
Forks
1
Activity over time
Daily event counts in the loaded window
Line chart, 488 days from 2023-08-15 to 2024-12-14. Pushes: 157 total, peak 9 in a day. Pull requests: 156 total, peak 11 in a day. Issues: 149 total, peak 11 in a day. Comments: 600 total, peak 28 in a day. Stars: 2 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| twVolc | 604 | 119 | 103 | 292 |
| ubdbra001 | 393 | 24 | 47 | 259 |
| tpering | 70 | 2 | 2 | 33 |
| christopher-wild | 16 | 6 | 2 | 7 |
| fredsonnenwald | 13 | 6 | 2 | 2 |
| alfabimsakti | 10 | 0 | 0 | 6 |
| hcalleja99 | 2 | 0 | 0 | 1 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.