Connects Jupyterlab and the Gitlab CI/CD application building system
active 2023-08-17 → 2025-04-10 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 603 days from 2023-08-17 to 2025-04-10. Pushes: 10 total, peak 2 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 2 total, peak 1 in a day. Comments: 3 total, peak 1 in a day. Stars: 1 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| edwinsarkissian | 11 | 10 | 0 | 1 |
| mcduffie | 3 | 0 | 0 | 1 |
| GodwinShen | 1 | 0 | 0 | 1 |
Recent activity
Latest issues, pull requests and releases
- Issue comment#2mcduffie2025-04-10 22:20Create an API endpoint to provide status on application build status per Git repository
- Issue#10mcduffie2024-09-26 17:42Modify pipeline builder to set umask before installing Github packages
- Releasemcduffie2024-07-03 19:360.1.0
- Issue comment#9edwinsarkissian2024-05-29 21:11Automate creation of MCP subgroups
- Issue comment#4GodwinShen2024-03-11 23:01Modify automation pipeline such that can be used with keys per subgroup
- Issue#3mcduffie2023-08-29 17:43Seperate out Gitlab YML process into seperate steps
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.