Skip to content

Goal-oriented Action Planning (GOAP) with Bevy integration

active 2024-08-11 → 2026-05-08 (UTC)

Complete coverage28,177 / 28,177 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-01 (UTC)
Events
211
Pushes
19
Pull requests
11
Issues
7
Stars
143
Forks
11

Activity over time

Daily event counts in the loaded window

Line chart, 636 days from 2024-08-11 to 2026-05-08. Pushes: 19 total, peak 5 in a day. Pull requests: 11 total, peak 2 in a day. Issues: 7 total, peak 2 in a day. Comments: 11 total, peak 5 in a day. Stars: 143 total, peak 9 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
victorb341946
janhohenheim7023
he-chien-tsai2011
ColinGilbert2000
ogghead2011
splashdust1010
alexniver1000
szabgab1010
dsgallups1010

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 143 stars here means stars gained during the window, not the repo's star count.