这是一个新手向的语义分割教程。该教程基于马赛诸塞州建筑物数据集,从零开始完成一个语义分割任务。利用深度学习模型和忽略边缘的滑窗算法对大尺寸的遥感图像进行建筑物提取,并将预测结果转换为矢量文件,便于后续利用arcgis软件进行进一步分析。
active 2025-05-21 → 2025-12-28 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 222 days from 2025-05-21 to 2025-12-28. Pushes: 1 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 5 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| vincent-stu | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 5 stars here means stars gained during the window, not the repo's star count.