Skip to content

vinid/NegotiationArena

View on GitHub ↗Related repositories →

2402 Arxiv Bianchi How Well Can LLMs Negotiate? NEGOTIATIONARENA Platform and Analysis

active 2024-02-05 → 2026-09-15 (UTC)

Complete coverage28,050 / 28,050 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-26 (UTC)
Events
152
Pushes
50
Pull requests
6
Issues
2
Stars
71
Forks
18

Activity over time

Daily event counts in the loaded window

Line chart, 954 days from 2024-02-05 to 2026-09-15. Pushes: 50 total, peak 14 in a day. Pull requests: 6 total, peak 4 in a day. Issues: 2 total, peak 1 in a day. Comments: 2 total, peak 2 in a day. Stars: 71 total, peak 6 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
vinid505000
ashishpanchal336042
fbdeme2000
louridas1010
dependabot[bot]1010

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 71 stars here means stars gained during the window, not the repo's star count.