Skip to content

Mix task to generate a Software Bill-of-Materials (SBoM) in CycloneDX format

active 2023-09-09 → 2025-07-07 (UTC)

Moved — now at erlef/mix_sbom since 2025-11-12. This page keeps the history recorded under the old name.Linked by GitHub's repository id. Older names can be missing when an old name was later reused (e.g. forked back). Charts on this page cover this name only.

Archive files: complete28,867 / 28,867 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-29 (UTC)Some event types are under-captured. Data limits →
Events
73
Pushes
11
Pull requests
13
Issues
1
Recorded stars
9
Recorded forks
6

Activity over time

Daily event counts in the loaded window

Line chart, 668 days from 2023-09-09 to 2025-07-07. Pushes: 11 total, peak 5 in a day. Pull requests: 13 total, peak 5 in a day. Issues: 1 total, peak 1 in a day. Comments: 20 total, peak 6 in a day. Recorded stars: 9 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Release rhythm

2 release days recorded.

2 release days between 2024-01-01 and 2025-05-31 (UTC): 25 Sep 2024, 28 May 2025.

25 Sep 2024 · 28 May 2025

Release day = a UTC day with at least one GitHub Release, 2024-01-01 to 2025-05-31.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
voltone281188
bforchhammer7004
aschiavon915014
tomekowal2020
MaudThomas1001
eriknaslund1000
exlee1010
fhunleth1010
joshprice1001
jrjsmrtn1001
visciang1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 9 stars here means stars gained during the window, not the repo's star count.