Skip to content

[copy] Requirements for Japanese Digital Text Layout

active 2023-08-18 → 2026-09-16 (UTC)

Complete coverage28,147 / 28,147 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-30 (UTC)
Events
615
Pushes
228
Pull requests
4
Issues
30
Stars
9
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 1126 days from 2023-08-18 to 2026-09-16. Pushes: 228 total, peak 24 in a day. Pull requests: 4 total, peak 1 in a day. Issues: 30 total, peak 3 in a day. Comments: 80 total, peak 9 in a day. Stars: 9 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
kidayasuo193152127
KobayashiToshi10275019
himorin16039
xfq12007
JunTajima6006
yamahige5005
taroyamamoto-4513003
r12a3003
murata2makoto2100
macnmm1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 9 stars here means stars gained during the window, not the repo's star count.