Oauth2 server
active 2025-04-07 → 2025-12-01 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 239 days from 2025-04-07 to 2025-12-01. Pushes: 18 total, peak 10 in a day. Pull requests: 10 total, peak 5 in a day. Issues: 40 total, peak 37 in a day. Comments: 13 total, peak 11 in a day. Stars: 2 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| wagnerdevocelot | 68 | 18 | 10 | 0 |
| Copilot | 22 | 0 | 0 | 13 |
Recent activity
Latest issues, pull requests and releases
- Pull request#41wagnerdevocelot2025-07-14 00:03
- Issue#15wagnerdevocelot2025-07-13 23:39Epic 2.2: Integração com os Fluxos Existentes no Identity Go
- Pull request#40wagnerdevocelot2025-07-13 23:39
- Pull request#39wagnerdevocelot2025-07-13 23:37
- Pull request#38wagnerdevocelot2025-07-13 23:30
- Pull request#38wagnerdevocelot2025-07-13 23:29
- Issue#11wagnerdevocelot2025-07-13 23:27Epic 2.1: Implementação do Adapter de Acesso ao Banco
- Issue#7wagnerdevocelot2025-07-13 23:27Epic 1.2: Levantamento dos Requisitos do Banco Legado
- Pull request#37wagnerdevocelot2025-07-13 23:27
- Issue#3wagnerdevocelot2025-04-13 04:21Epic 1.1: Análise do Storage Atual e Definição da Interface
- Issue#6wagnerdevocelot2025-04-13 04:20Identificar as dependências e os pontos críticos de integração com o fluxo de autenticação.
- Issue#5wagnerdevocelot2025-04-13 04:14Definir uma interface (contrato) genérica para o storage, que contemple as operações essenciais para o serviço (por exemplo, métodos como Create, Read, Update e Delete).
- Pull request#35wagnerdevocelot2025-04-13 04:14
- Pull request#35wagnerdevocelot2025-04-13 04:13
- Issue#4wagnerdevocelot2025-04-13 03:52Levantar e documentar os métodos e dados atualmente armazenados na camada in-memory (ex.: criação, verificação e remoção de tokens, sessões, etc.).
- Issue#34wagnerdevocelot2025-04-13 03:08Revisar políticas de segurança e conformidade à luz das novas integrações com o banco legado.
- Issue#33wagnerdevocelot2025-04-13 03:08Definir canais de comunicação e planos de suporte para monitorar a migração em tempo real.
- Issue#32wagnerdevocelot2025-04-13 03:08Agendar sessões de treinamento para a equipe, detalhando as mudanças e os novos procedimentos de acesso ao banco.
- Issue#31wagnerdevocelot2025-04-13 03:08Epic 4.2: Treinamento e Comunicação com a Equipe
- Issue#30wagnerdevocelot2025-04-13 03:07Elaborar diagramas que ilustrem a arquitetura antes e depois da migração.
- Issue#29wagnerdevocelot2025-04-13 03:07Redigir guias de configuração, deploy e troubleshooting para a nova camada.
- Issue#28wagnerdevocelot2025-04-13 03:07Atualizar a documentação do projeto com a nova estrutura de storage e as mudanças no acesso ao banco legado.
- Issue#27wagnerdevocelot2025-04-13 03:07Epic 4.1: Documentação Técnica e Procedimentos Operacionais
- Issue#26wagnerdevocelot2025-04-13 03:06Definir e testar procedimentos de rollback caso sejam detectados problemas críticos durante a transição.
- Issue#25wagnerdevocelot2025-04-13 03:06Realizar uma migração canary (gradual) em ambientes de staging e produção, monitorando métricas e logs.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.