Skip to content

A small framework to split app into small parts

active 2023-08-282026-02-17 (UTC)

Complete coverage26,562 / 26,562 hourly files (100%) · 2 absent upstream2023-08-152026-08-25 (UTC)
Events
84
Pushes
0
Pull requests
2
Issues
2
Stars
65
Forks
15

Activity over time

Daily event counts in the loaded window

Line chart, 905 days from 2023-08-28 to 2026-02-17. Pushes: 0 total, peak 0 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 2 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 65 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
kjayavardhan022020
uplinux1000
liyuhaolol1000

Recent activity

Latest issues, pull requests and releases

  • Issue#515liyuhaolol2024-10-18 14:21
    Unexpected failure during lint analysis of HomeActivity.java (this is a bug in lint or one of the libraries it depends on)无法解决
  • Issue#620uplinux2023-10-18 03:05
    SDK版本支持情况。
  • Pull request#619kjayavardhan022023-09-23 13:50
  • Pull request#619kjayavardhan022023-09-23 13:49

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 65 stars here means stars gained during the window, not the repo's star count.