Skip to content

workflow 工作流设计器,企业OA流程设计。表单流程设计界面操作超级简单!!普通用户也能分分钟上手,不需要专业知识。本设计器支持可视化拖拽表单组件,动态任意层级结构审批节点,支持复杂流程条件设置

active 2023-08-24 → 2026-09-17 (UTC)

Complete coverage28,111 / 28,111 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-29 (UTC)
Events
306
Pushes
0
Pull requests
0
Issues
4
Stars
268
Forks
33

Activity over time

Daily event counts in the loaded window

Line chart, 1121 days from 2023-08-24 to 2026-09-17. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 4 total, peak 1 in a day. Comments: 1 total, peak 1 in a day. Stars: 268 total, peak 5 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
wego-xuchang1000
liujiangxu1000
wego-xc1000
CT9408280711000
willianfu1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 268 stars here means stars gained during the window, not the repo's star count.