Skip to content

winter-love-dev/LanguageStudy

View on GitHub ↗Related repositories →

active 2025-10-232025-11-02 (UTC)

Complete coverage26,345 / 26,345 hourly files (100%) · 2 absent upstream2023-08-152026-08-16 (UTC)
Events
58
Pushes
14
Pull requests
9
Issues
17
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 11 days from 2025-10-23 to 2025-11-02. Pushes: 14 total, peak 10 in a day. Pull requests: 9 total, peak 5 in a day. Issues: 17 total, peak 6 in a day. Comments: 2 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
winter-love-dev421492

Recent activity

Latest issues, pull requests and releases

  • Pull request#21winter-love-dev2025-11-02 09:40
  • Issue#20winter-love-dev2025-11-02 09:38
    [FEATURE] `:design-system` module have too many responsibility.
  • Issue#20winter-love-dev2025-11-02 09:38
    [FEATURE] `:design-system` module have too many responsibility.
  • Pull request#15winter-love-dev2025-11-02 04:49
  • Issue#12winter-love-dev2025-11-02 04:40
    Add github actions
  • Pull request#13winter-love-dev2025-11-02 04:23
  • Pull request#11winter-love-dev2025-11-02 03:48
  • Pull request#11winter-love-dev2025-11-02 03:48
  • Issue#10winter-love-dev2025-11-01 11:11
    Add translation sctipt
  • Issue#10winter-love-dev2025-11-01 11:11
    Add translation sctipt
  • Issue#6winter-love-dev2025-11-01 11:09
    Phase - 1: Create sample app for design system & UI testing
  • Issue comment#6winter-love-dev2025-11-01 10:41
    Create sample app for design system & UI testing
  • Issue#6winter-love-dev2025-11-01 10:40
    Create sample app for design system & UI testing
  • Pull request#8winter-love-dev2025-11-01 10:30
  • Issue#7winter-love-dev2025-10-26 08:18
    Setup my figma task enviorment
  • Issue#7winter-love-dev2025-10-26 07:10
    Setup my figma task enviorment
  • Issue comment#7winter-love-dev2025-10-26 07:01
    Setup my figma task env
  • Issue#7winter-love-dev2025-10-26 06:55
    Setup my figma task env
  • Issue#6winter-love-dev2025-10-26 03:47
    Create sample app for design system & UI testing
  • Issue#3winter-love-dev2025-10-26 03:46
    Setup & Build design sytem
  • Issue#4winter-love-dev2025-10-26 03:21
    Structural design "Design System"
  • Pull request#5winter-love-dev2025-10-26 03:09
  • Pull request#5winter-love-dev2025-10-26 03:09
  • Issue#4winter-love-dev2025-10-25 00:04
    Structural design "Design System"
  • Issue#3winter-love-dev2025-10-23 22:31
    Setup design sytem

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.