招投标辅助管理系统是一款为招标代理机构设计的综合性业务管理平台,系统包括以下七大模块:项目立项与审核、标书编写与审核、招标公告编写、审核与发布、招标时间与场地预约、投标人报名和信息审核、生成开评标所需要的各种辅助性文档。 详细信息可以看软件使用文档了解相关功能。
active 2026-02-15 → 2026-02-15 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 1 days from 2026-02-15 to 2026-02-15. Pushes: 2 total, peak 2 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| wmhello | 2 | 2 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.