Skip to content

wso2/integration-samples

View on GitHub ↗Related repositories →

This repository contains a collection of sample projects ready to deploy in Devant, a powerful IPaaS with first-class AI support. These samples demonstrate various use cases and provide examples for different scenarios.

active 2025-03-14 → 2026-09-24 (UTC)

Complete coverage27,709 / 27,709 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-12 (UTC)
Events
806
Pushes
60
Pull requests
91
Issues
2
Stars
1
Forks
26

Activity over time

Daily event counts in the loaded window

Line chart, 560 days from 2025-03-14 to 2026-09-24. Pushes: 60 total, peak 7 in a day. Pull requests: 91 total, peak 13 in a day. Issues: 2 total, peak 1 in a day. Comments: 350 total, peak 69 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.