Readyn 把你的跑步和攀岩数据汇成一个「就绪度」评分,让你每天清楚地知道:是该顶上去,还是该悠着点。它对接你已经在用的设备和 App,自动追踪训练负荷(ACWR)、恢复状态(HRV)和长期趋势;再用 AI 在伤病发生前提前预警、生成每周课表,并像一个真正看得懂你数据的教练一样,随时回答你的训练问题。
active 2026-06-21 → 2026-07-01 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 11 days from 2026-06-21 to 2026-07-01. Pushes: 30 total, peak 8 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 2 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| wyizhou | 33 | 30 | 1 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.