历史迁移解决方案。微服务的架构为基础,使用多种设计模式,如:单利、桥接、工厂、模板、策略等。其中涉及的核心技术有,多线程、过滤器等。致力于解决mysql大表迁移的问题。提供多种迁移模式,如:库到库、库到文件再到库等! Historical migration solution. Based on the architecture of microservices, multiple .......
active 2023-09-01 → 2025-06-28 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 667 days from 2023-09-01 to 2025-06-28. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 4 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
Nobody pushed, opened or commented here in the loaded window — this repo's activity is stars and forks only.
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.